Greenwood Railway Station
A confined site bounded by the north and south carriageways of the Mitchell Freeway and the operating train transit system made this a challenging project. Pritchard Francis was commissioned to undertake the redesign services and site supervision of the original structure designed by others. A saving of nearly 12 tonnes of structural steel was achieved from the footbridge main framing.
